Waterloo Station, London
- Location
- London, UK
- Year
- 19xx
- Sector
- Construction
Project Timeline
Project Management was key to deadlines being met for everyone involved.
![Waterloo Station | NTR Ltd](https://www.ntrltd.com/wp-content/uploads/2016/10/NTR-projects-waterloo-1.png)
A great project for an iconic building in the centre of London. The work completed by TAE back in 1990’s was a pleasure to work on and one of which we’re still very proud.
The original brief from NetworkRail saw the team working on the pin assemblies for the roof joints of the new roofing system for the station.
![Waterloo Station Case Study | NTR Ltd](https://www.ntrltd.com/wp-content/uploads/2016/10/NTR-projects-waterloo-2.png)
![Waterloo Station entrance | NTR Ltd](https://www.ntrltd.com/wp-content/uploads/2016/10/NTR-projects-waterloo-4.png)
Rigorous testing in the early stages of development meant that we were sure of the strength and longevity of the components we were producing. Our attention to detail at the Research & Development stage meant we could design out any issues that came up.
Finally after manufacture, we were able to QC all components and ensure they were well within expected tolerances. Getting it right was everything to us.
![Police memorial | NTR Ltd](https://www.ntrltd.com/wp-content/uploads/2021/10/NTR-Police-3.jpg)
- Service
- Engineering
- Project
- London Waterloo
- Status
- Completed in 19xx